Listen to RFI News
Expand Player
 
Listen Download Podcast
  • Paris Live PM 1300 - 1400 GMT
    News bulletin 05/21 13h00 GMT
  • Paris Live PM 1300 - 1400 GMT
    News bulletin 05/20 13h00 GMT
  • Paris Live PM 1300 - 1400 GMT
    News bulletin 05/17 13h00 GMT
  • 13h00 - 14h00 GMT
    News bulletin 04/05 13h00 GMT
  • 13h00 - 14h00 GMT
    News bulletin 04/04 13h00 GMT
  • 13h00 - 14h00 GMT
    News bulletin 04/03 13h00 GMT
To take full advantage of multimedia content, you must have the Flash plugin installed in your browser. To connect, you need to enable cookies in your browser settings. For an optimal navigation, the RFI site is compatible with the following browsers: Internet Explorer 8 and above, Firefox 10 and +, Safari 3+, Chrome 17 and + etc.
Asia-Pacific

Suspension of repair work at Fukushima after detection of high radiation levels

media Repair work at Fukushima suspended after just five hours Reuters/Tokyo Electric Power Co

Japan’s Tokyo Electric Power Company, Tepco, has suspended a clean-up operation of waste water at its Fukushima nuclear plant after just five hours following the detection of higher-than-expected radiation levels.

 

The operator of the plant said it had stopped the operation because a part of the system that absorbs radioactive caesium needed to be replaced sooner than expected.

Engineers speculated that highly radioactive mud might have entered the treatment system or that waste water was more radioactive than previously measured.

The world’s worst nuclear disaster since Chernobyl in 1986 has cased radioactive material to leak into the air, ground and sea around the plant and forced the evacuation of 80,000 people in a 20 kilometre radius.

Water has been pumped into reactor cores and fuel rod pools, leaving more than 100,000 tonnes of contaminated water in basements, drains and ditches, some of which has leaked into the ocean. The water needs to be decontaminated before it can be stored or recycled back through the reactors to cool them,

Pumping out the highly radioactive water will allow the task of long-term repair work to the cooling system to begin.

Of Japan’s 54 commercial nuclear reactors, 17 are currently in operation. Two other units are in test operation but offline. The remaining 35 reactors, including six at the Fukushima plant, have remained shutdown due to quake damage or routine inspections.
 

Related
 
Sorry but the period of time connection to the operation is exceeded.