Listen to RFI News
Expand Player
 
Listen Download Podcast
  • Paris Live PM 1300 - 1400 GMT
    News bulletin 09/19 13h00 GMT
  • Paris Live PM 1300 - 1400 GMT
    News bulletin 09/18 13h00 GMT
  • Paris Live PM 1300 - 1400 GMT
    News bulletin 09/17 13h00 GMT
  • 13h00 - 14h00 GMT
    News bulletin 04/05 13h00 GMT
  • 13h00 - 14h00 GMT
    News bulletin 04/04 13h00 GMT
  • 13h00 - 14h00 GMT
    News bulletin 04/03 13h00 GMT
To take full advantage of multimedia content, you must have the Flash plugin installed in your browser. To connect, you need to enable cookies in your browser settings. For an optimal navigation, the RFI site is compatible with the following browsers: Internet Explorer 8 and above, Firefox 10 and +, Safari 3+, Chrome 17 and + etc.
Afp

WADA suspends New Delhi lab over test

By AFP
media

The World Anti-Doping Agency (WADA) has suspended the accreditation of the National Dope Testing Laboratory (NDTL) in New Delhi, barring the facility from conducting any anti-doping tests for up to six months.

The suspension, which took effect on August 20, was imposed due to non-conformities with the International Standard for Laboratories, the global anti-doping body said Thursday.

The irregularities, identified during a site visit by WADA, included some in relation to the lab's Isotope ratio mass spectrometry (GC/C/IRMS) analytical method.

After WADA's laboratory expert group recommended disciplinary proceedings in May, a disciplinary committee recommended the suspension.

While the lab is suspended samples that have not yet been analyzed by the lab, samples undergoing a confirmation test and any samples that have returned an adverse result must be securely transported to another WADA-accredited laboratory for testing.

"This is in order to ensure continued high-quality sample analysis, which also helps preserve athletes' confidence in this process and the wider anti-doping system," WADA said in a statement.

The laboratory can appeal the suspension or apply for reinstatement before six months have passed if it has addressed non-conforming procedures.

 
Sorry but the period of time connection to the operation is exceeded.